New Building Kantonsschule Rotkreuz

Due to its central location directly at Rotkreuz railway station, the Kantonsschule Rotkreuz becomes a key meeting place. Together with the developments at Bahnhof Süd, the Dorfmatt Centre, and Lucerne University of Applied Sciences and Arts, it strengthens and consolidates the town centre of Rotkreuz.
The building responds volumetrically with a head and a wing; its head to the centre of Rotkreuz, and its wing to the neighbouring sports facility. A generous forecourt extends around the building, creating a transition to the sports grounds and the school’s outdoor areas to the east. An external staircase leading to a large rooftop terrace and landscaped pergola further expands this outdoor space. Along the west and south façade, arcades mediate between the interior and exterior spaces.
The new building for 44 school classes provides flexibly adaptable rooms and open areas for the implementation of new cooperative and interdisciplinary learning methods. The head contains the public spaces, such as the auditorium, media library, and the four-part sports hall, while the wing accommodates the general teaching classrooms.
The school building is characterized by a large public atrium in the head and several smaller atria in the wing, around which the individual learning clusters are arranged. The timber-hybrid construction remains visible and defines the character of the interior spaces.
The façades are equipped with photovoltaic elements on three sides, while the north façade integrates vertical greenery formed by climbing plants rooted in the ground.

Location Risch-Rotkreuz

Programme Cantonal school for 880 students in 44 classes.
Six- to eight-storey new building with class and subject rooms, auditorium, cafeteria, common areas, information centre with media library, staff rooms, and a triple and single gymnasium on the top floor.
Four internal atria create vertical connections.
Site planning with zones for outdoor teaching, a covered outdoor common area, and an outdoor cafeteria area.
Photovoltaics on the façades and roof surfaces, façade greening, and a green roof terrace with pergola, accessible via an external staircase.

Competition Dec. 2024 – Dec. 2025, 1st Prize

Gross Floor Area 18‘567 m2

Competition Organzier Hochbauamt Kanton Zug

Team GG Mike Guyer, Stefan Thommen, Elena Hofbeck, Sophie Judson, Matthias Clivio, Florian Meissner, Darius Ludwig-Dinkel (I), Dominic Pecina (I)

Construction Management Ghisleni Partner AG, Rapperswil

General Planning GP KS Rotkreuz Gigon Guyer Ghisleni

Landscape Architecture Bischoff Landschaftsarchitekten GmbH, Baden

Structural Engineer WaltGalmarini AG, Zurich

Electrical Engineer Jules Häfliger AG, Luzern

Building Services Engineer Eicher+Pauli AG, Bern

Fire Safety Makiol Wiederkehr AG, Beinwil am See

MSRL Eicher+Pauli AG, Bern

Plumbing Eicher+Pauli AG, Bern

Sustainability Lemon Consult AG, Zurich

Model Modellbau Zaborowsky GmbH, Zurich
Gigon Guyer

Visualization Zuend, Zurich

Photos Gigon Guyer