Novartis Laboratory and Knowledge Center

Location Basel, Switzerland

Programme Laboratory, office

Competition 2003

Competition Organzier Novartis Pharma AG, Basel

Team GG Stine Henckel Schultz, Stefan Thommen, Raul Mera

Cost Planning/Scheduling PBK AG, Rüti

Structural Engineer Dr. Lüchinger + Meyer Bauingenieure AG, Zurich

Building Services Engineer HL-Technik AG, Zurich

Other Laboratory Technology: Volker Krieger, Freiburg-Opfingen, Germany

Housing Development Wolfswinkel

The longitudinal area to be developed, running approximately from west to east, is situated between Wolfswinkel and Teufwiesenstrasse in Unter-Affoltern, and represents the transition from urban space to rural landscape, while at the same time functioning as a filter. Therefore, the complete building mass is divided into individual building groups, which again are composed of three volumes. Two houses of these groups of three, alternately oriented northwards and southwards, face the road, one is directed towards the middle of the allotment, from where all buildings are accessed (if they are not entered directly from the underground car park). Small access roads or paths lead to the streets, a meandering path connects the houses along the linear axis of the allotment. Children’s playgrounds, public areas, meadows and private gardens belonging to the ground floor flats are separated by hedges and form a patchwork of outside spaces of varying quality.

The flats are aligned from north to south and are additionally illuminated from the west or the east in order to enable a view both of the landscape and the townscape, as well as the sunshine on the southern side. A 4 1/2 room flat with a Z-shaped displaced living/dining room connecting the north and the south sides and two loggias represent the basic type. Depending upon the location, 1 room, 2 1/2 room, 3 1/2 room and 5 172 room flats are located on the ground floor, on the top floor under the roof are 5 1/2 room or 4 1/2 room flats with a separate single room. The roof terraces serve as communal outside areas.  Side rooms, the janitor’s apartment, communal rooms as well as flexible floor areas for offices or hobbies, are located on the base floor of the houses directed towards Teufwiesen Street.

The three- to four-storey volumes distributed over the slightly sloping terrain are composed of plastered single brick masonry and concrete plates. The separation of the individual building groups is emphasised using colour.

On the separate western allotment, the houses are pushed together to form a single meandering group. A school building is situated at the head of the entire development.

Text: Hubertus Adam

Location Zurich-Affoltern

Programme 2.5–5.5 room apartments, childcare, kindergarten, neighbourhood meeting point, communal room

Competition 2003

Competition Organzier ABZ – Allgemeine Baugenossenschaft Zurich

Team GG Mathias Brühlmann, Raul Mera

Landscape Architecture Zulauf Seippel Schweingruber GmbH, Landschaftarchitekten, Baden

Structural Engineer Dr. Lüchinger + Meyer Bauingenieure AG, Zurich

Row Houses Bosrijk

Location Eindhoven, The Netherlands

Programme 49 Row Houses

Planning/Construction 2007–2008

Client AM Wonen, Eindhoven, The Netherlands

Team GG Kim Sneyders (Project Manager), Daniela Bergmann, Peter Graf

Landscape Architecture Karres en Brands landschapsarchitecten bv, Hilversum, The Netherlands

Other Building Contractor: BAM woningbouw, Weert, The Netherlands

Extension of the Espace de l’Art Concret Collection, Phase 1

Location Mouans-Sartoux, France

Programme Museum extension

Planning/Construction 2014–2018 (not realized)

Team GG Mike Guyer, Damien Andenmatten (Project Manager), Nicolas Hunkeler

Housing Development CU West

Location Uetikon, Switzerland

Programme Housing Development

Competition 2004

Gross Floor Area 28'736 m2

Competition Organzier CPH Chemie und Papier Holding AG, Perlen

Team GG Volker Mencke, Pieter Rabijns, Raul Mera, Hyung-Sup Soh

Landscape Architecture Hager Landschaftsarchitektur AG, Zurich

Other Immobilien Management und Beratung: Colliers CSL AG, Zurich

Fuglsang Kunstmuseum

Location Toreby Lolland, Denmark

Programme Art Museum

Competition 2005

Client Building Foundation
represented by: Akademisk Arkitektforening, Arkitekternes Hus, Copenhagen, Denmark

Team GG Stefan Thommen, Stine Henckel Schultz, Raul Mera

Contact architects Jensen + Jørgensen + Wohlfeldt, Copenhagen

Landscape Architecture Schweingruber Zulauf Landschaftsarchitekten, Zurich

Structural Engineer Aerni + Aerni Ingenieure AG, Zurich

Lighting Consultant Institut für Tageslichttechnik Stuttgart, Germany

Extension of Office Building UICN

Location Gland, Switzerland

Programme Offices, conference rooms, library, kindergarten

Competition 2005

Competition Organzier UICN, l’Union Internationale pour la Conservation de la Nature

Team GG Caspar Bresch, Karin Schultze, Leander Morf, Raul Mera

Landscape Architecture Schweingruber Zulauf Landschaftsarchitekten, Zurich

Structural Engineer Fiechter Ingénierie SA, Chêne-Bourg

Facade PGMM Schweiz AG, Winterthur

ZürichForum – New Congress Center

Location Zurich, Switzerland

Programme Congress, hotel, lobby, Tonhalle, Club Baur au Lac

Competition 2005

Competition Organzier Zürich Forum AG

Team GG Caspar Bresch, Volker Mencke, Leander Morf, Raul Mera

Structural Engineer Henauer Gugler AG, Zurich

Building Services Engineer Gruenberg + Partner AG, Zurich

Residential and Retail Building Terrains Renault, Rives de Seine

Location Paris, France

Programme Accommodation, service and student residences, shops

Competition 2005

Competition Organzier Ville de Boulogne-Billancourt, ZAC Seguin Rives de Seine

Team GG Karin Schultze, Gaby Kägi, Leander Morf

Site Management O.T.H. Bâtiments, Paris, France

Landscape Architecture Hager Landschaftsarchitektur AG, Zurich

Housing Development Tramstrasse / Funkwiesenstrasse

Location Zurich, Switzerland

Programme 70 apartments, 3.5- and 4.5-rooms, common room, craft rooms

Competition 2009

Gross Floor Area 12'069 m2

Competition Organzier BAHOGE Wohnbaugenossenschaft, Wohnsiedlung Tram-/Funkwiesenstrasse

Team GG Martin Schiess, Bettina Gerhold, Karsten Bucholz, Thomas Möckel, Damien Andenmatten

Landscape Architecture Westpol Landschaftsarchitektur GmbH

Cost Planning/Scheduling b+p baurealisation ag, Zurich

Structural Engineer Dr. Lüchinger + Meyer Bauingenieure AG, Zurich

Building Services Engineer Waldhauser Haustechnik AG, Basel