Refurbishment of the Herdern High-rise Building

The slab-shaped high rise in western Zurich is part of the Herdern Migros headquarters, which opened in 1965 and is now listed as an industrial heritage site. Over the years, the brick facade of the 17-storey building has become weatherworn and is undergoing comprehensive refurbishment. The urban and preservation context as well as the building’s proportions are particularly significant in this respect.

The work comprises the static and energetic renovation, including HVAC renewal. On the shorter sides, the load-bearing structure is being reinforced, while the existing brick facades and parapets will be replaced and thermally insulated all around. The new fair-faced masonry walls resemble the old ones in brick format, texture and colour. New aluminium windows with triple insulation glazing meet the thermal and acoustic specifications. Inside, the ribbed concrete ceilings of the office spaces will be uncovered and will serve as temperature buffer. They create a workshop-like atmosphere that matches the industrial history and aesthetic of the building.

The setback top storey, surrounded by a roof terrace, houses an executive board room. The entire space, along with the small kitchen, will be refurbished and offers panoramic views of Zurich West and the Alps.

Location Zurich, Switzerland

Programme Refurbishment of the listed office high-rise building (built in 1965 by the architects Hans Vogelsanger, Ernst Schwarzenbach, Albert Maurer),
19 floors (1 underground, 18 above ground), 500 workplaces, seminar rooms

Competition 2018, 1st Prize Gigon/Guyer Architekten with WaltGalmarini

Planning/Construction 2019–2023

Client Genossenschaft Migros Zurich

Gross Floor Area 9‘948 m2

Team GG Competition: Mike Guyer, Stefan Thommen, Filippo Cattaneo, Vladimir Dianiska, Milica Brockmann

Site Management Spiegel + Partner AG, Zurich

Cost Planning/Scheduling Spiegel + Partner AG, Zurich

Structural Engineer WaltGalmarini AG, Zurich

Electrical Engineer Eplan AG, Reinach

Fire Safety Migros Engineering Solutions, MGB

MSRL Concept-G AG, Winterthur

Heating/Cooling Concept-G AG, Winterthur

Ventilation Engineer Concept-G AG, Winterthur

Facade Reba Fassadentechnik AG, Chur

Photos Tom Licht (Drone image)

New Social Insurance Centre WAS (Wirtschaft Arbeit Soziales)
Areal Eichhof West

Location Kriens, Switzerland

Programme Offices 700 workplaces, seminar rooms, canteen, cafeteria

Competition 2020, 1st Prize

Client WAS Immobilien AG

Gross Floor Area 22‘759 m2

Team GG Competition: Mike Guyer, Stefan Thommen, Lukas Kübli, Dario Caccialupi, Jan Zimmermann (I)

Structural Engineer EBP Schweiz AG, Zurich

Building Services Engineer EBP Schweiz AG, Zurich

School Building Freilager

Location Zurich-Albisrieden

Programme School, double sports hall, swimming pool

Competition 2016

Client Building Office of City of Zurich

Gross Floor Area 9‘466 m2

Team GG Mike Guyer, Daniela Schadegg, Leyla Ilmann, Luisa Wittgen

Landscape Architecture Bassinet Turquin Paqysage, Paris, France

Structural Engineer WaltGalmarini AG, Zurich

Swiss Museum of Transport – Urban Development Concept

The development concept for the Museum of Transportation in Lucerne takes as its point of departure an urbanistic configuration that already exists in the southern part of the complex: the addition of solitary, thematic buildings. In the future urbanistic layout the individual building volumes are to be linked on various levels by gangways, bridges and ramps. Thus, a “central” outdoor space will gradually develop between the buildings that is articulated and zoned through the position of the buildings and the gangways. The additive principal enables visitors to easily find the individual thematic areas, and allows a simple, phased realization of the future building projects as well as a stylistic plurality among the buildings. The latter is sought instead of attempting to lay down an obligatory, unified design strategy for future generations.

The first building phase, the "Street Forum", involves a new building placed on the eastern edge of the complex. It bounds the exterior space here that currently drifts off into the adjacent housing quarter void of any tension. The theme of riding, of "moving on wheels" is picked up architecturally by means of circulation ramps that allow the building to be accessed on various levels without any stairs. Two bridges connect the building with the Maritime Hall and the Rail Traffic Hall. In addition, a "transverse gangway" will lead from the entrance area to the "Street Forum" in a future development phase.

The exhibition zones are arranged upon three levels. They are divided into areas that are lit with daylight along the façades and areas located in the center of the building lit artificially. Electrically-controlled sun shading blinds made with fabrics (as in the roofs of convertible cars) or plastic tarps (such as cover trucks) regulate the light and heat gain levels of the building during the day.

The load-bearing structure mirrors the usage arrangement: slanted steel-concrete composite columns form the outer support structure and stiffen the building along its exterior envelope. The filigree statics of the bridges and ramps, which "ride" about and dock with the building, also characterize the building's façade. Concrete wall panels plus a stair and elevator core—whose placement can be freely chosen—take over the load-bearing function within the building. With a thickness of 40 to 45 centimeters the ceilings are able to accommodate ventilation ductwork, allowing one to forgo the use of suspended ceiling elements.

The materials are those found in rough construction. Concrete floors and ceilings as well as the steel support structure remind one of industrial buildings as well as street and bridge construction. The large-scale glazing of the façades nevertheless goes beyond the "garage-like" atmosphere to communicate an ambience of presentation—similar to that of an automobile showroom.

Location Lucerne, Switzerland

Competition 1999, 1st Prize

Competition Organzier Swiss Museum of Transport, Lucerne

Team GG Annette Gigon, Mike Guyer, Markus Lüscher, Dalila Chebbi, Christian Meyer, Roger Naegeli

Structural Engineer Dr. Lüchinger + Meyer Bauingenieure AG, Zurich

Exhibition Design Lars Müller, Baden

Résidence du Pré-Babel

The construction of apartment blocks of varying heights and different standards on the former Pré-Babel sportsground and park site pursues the idea of concentrated interventions, aimed at retaining as much open green space around and between the buildings as possible.

The first building phase, Pré-Babel, comprised three apartment blocks 1, 2, and 3 with three stories each, offering a total of twenty-eight condominiums for the high-end market segment. For the second phase, Résidence du Parc de Grange-Canal, three taller buildings with standard apartments were planned, also including subsidized housing in accordance with a special stipulation in Geneva’s building regulations. Finding a common architectural language and similar housing typology for all three categories was one of the challenges in developing this park site.

The siting and shape of the buildings create external spaces that are either dotted with trees or left open as lawns. Each apartment type benefits from windows on three or four sides, with views of the expanses of lawn and groups of trees in the park.

The access paths to the buildings 1, 2, and 3 wind through the park and lead to slightly sunken entrance areas. To keep traffic away from the park, the driveways to the garages run underneath it. The entrance hall can be accessed both from the park and directly from the garage. Polished chrome steel parapets open up this space optically, as does the light gray flooring of terrazzo and cast stone incorporating marble chips. The front doors to the apartments are made of dark oak with an equally wide illumination panel to one side. Exposed concrete walls form a contrast to the refined materials used in the staircases to lend the whole an appropriate everyday quality.

The naturally-lit staircases provide access to two or three apartments and one studio on each floor. The apartments have spacious floor plans and a generous ceiling height of 2.7 meters. From each apartment’s entrance area, the space is divided into two main zones: a daytime area with kitchen, dining room, living room, and study, and a nighttime area consisting of bedrooms with connecting bathrooms and dressing rooms. Each unit has a covered balcony and an additional winter garden. One apartment on the top floor of each building has its own private access to the large roof terrace with pavilions.

The building volumes with their composition of horizontal and vertical prefabricated concrete elements are almost classical in appearance. Horizontal gray bands are combined with yellow vertical elements of varying widths, which reference the coloring of the sandstone buildings in Geneva. Sliding windows with aluminium frames alternate with the yellow concrete elements. Reflective glass parapets intensify the play of mirrored trees in the windows and also amplify the impression of the façades forming a ‘geometric fabric interwoven with silver strands.’

Location Geneva, Switzerland

Programme Three residential buildings with 24 individually owned apartments in total (3–7 room apartments with 132–339 m2), 4 studios, underground parking with 60 parking spaces

Competition 2004, 1st Prize

Planning/Construction 2004–2008

Client Frontimmo SA, Chêne-Bougeries, Geneva

Gross Floor Area 11‘053 m2

Team GG Competition: Mike Guyer, Gilles Dafflon, Katja Schubert
Planning/Construction: Mike Guyer, Gilles Dafflon (Project Manager), Matthias Clivio, Christine Jahn, Andréanne Pochon, Pieter Rabijns, Katja Schubert, Michael Wagner

Site Management Roberto Carella Architectes, Geneva

Landscape Architecture Schweingruber Zulauf Landschaftsarchitekten, Zurich

Structural Engineer Fiechter Ingénierie SA, Chêne-Bourg

Electrical Engineer ECE SA, Bernex

Building Services Engineer Ryser Eco Sàrl, Genf and Mike Humbert, Geneva

Photos © Joël Tettamanti